Análise de alternativa para geração de energia elétrica em sistema isolado: dimensionamento da demanda, projeto executivo e cálculo de payback: estudo de caso

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorCardoso Júnior, Ricardo Abranches Felix-
Autor(es): dc.contributorSalcedo, Ivanovich Lache-
Autor(es): dc.contributorCataldi, Marcio-
Autor(es): dc.creatorSilva, Luma Americano da-
Data de aceite: dc.date.accessioned2024-07-22T13:56:06Z-
Data de disponibilização: dc.date.available2024-07-22T13:56:06Z-
Data de envio: dc.date.issued2024-07-12-
Data de envio: dc.date.issued2024-07-12-
Fonte completa do material: dc.identifierhttps://app.uff.br/riuff/handle/1/33266-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/capes/823268-
Descrição: dc.descriptionO presente trabalho teve como objetivo elaborar um projeto de viabilidade econômica e de implantação de um sistema fotovoltaico isolado (OFF-Grid), em substituição ao grupo gerador a diesel. Sendo assim, a área de estudo selecionada para instalação desse sistema está localizada no município de Assú, estado do Rio Grande do Norte, a qual não possui acesso à rede de energia elétrica. Nesse cenário, foi proposta uma análise que visa comprovar a eficiência operacional e econômica quanto a geração de energia solar fotovoltaica mediante dimensionamento técnico e análise de Payback, tendo em vista que normalmente os geradores a combustível fóssil são a primeira escolha quando se trata de zonas rurais ou remotas, principalmente por apresentarem um custo inicial razoável. Por fim, foi demonstrado que o sistema fotovoltaico OFF-Grid, em comparação ao grupo gerador a diesel, apresentou Payback aproximado de 11 meses, além de ser capaz de atender a demanda de consumo anual de 2,13 MWh, enquanto que sua produção energética está acerca de 2,45 MWh-
Descrição: dc.descriptionThe purpose of the present study was to develop a project of economic viability and implantation of an isolated photovoltaic system (OFF-Grid), to replace the diesel generator set. Hence, the study area selected to install such a system is located in the municipality of Assú, state of Rio Grande do Norte, where there is no access to electrical grid. In this scenario, we proposed an analysis that aims to prove the operational and economic efficiency regarding the propagation of photovoltaic power generation through technical dimensioning and Payback analysis, considering that fossil fuel generators are commonly the first choice when it comes to rural or remote areas, primarily because they present a reasonable initial cost. In conclusion, it has been demonstrated that the OFF-Grid photovoltaic system, compared to the diesel generator set, presented a 11-month Payback, in addition to being able to meet the annual consumption demand of 2.13 MWh, while its energy production is about 2.45 MWh-
Descrição: dc.description74 f.-
Formato: dc.formatapplication/pdf-
Idioma: dc.languagept_BR-
Direitos: dc.rightsOpen Access-
Direitos: dc.rightsCC-BY-SA-
Palavras-chave: dc.subjectEnergia fotovoltaica-
Palavras-chave: dc.subjectSistema isolado-
Palavras-chave: dc.subjectViabilidade econômica-
Palavras-chave: dc.subjectSistema fotovoltaico-
Palavras-chave: dc.subjectViabilidade econômica-
Palavras-chave: dc.subjectEnergia elétrica-
Palavras-chave: dc.subjectRio Grande do Norte-
Palavras-chave: dc.subjectPhotovoltaic energy-
Palavras-chave: dc.subjectOFF-Grid system-
Palavras-chave: dc.subjectEconomic viability-
Título: dc.titleAnálise de alternativa para geração de energia elétrica em sistema isolado: dimensionamento da demanda, projeto executivo e cálculo de payback: estudo de caso-
Tipo de arquivo: dc.typeTrabalho de conclusão de curso-
Aparece nas coleções:Repositório Institucional da Universidade Federal Fluminense - RiUFF

Não existem arquivos associados a este item.