Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
Autor(es): dc.contributor | Silva, Guido Vaz | - |
Autor(es): dc.contributor | Navarro, Leonardo Luiz Lima | - |
Autor(es): dc.contributor | Tammela, Iara | - |
Autor(es): dc.contributor | Silva, Guido Vaz | - |
Autor(es): dc.creator | Fonseca, Thiara Viana França | - |
Data de aceite: dc.date.accessioned | 2024-07-11T18:11:01Z | - |
Data de disponibilização: dc.date.available | 2024-07-11T18:11:01Z | - |
Data de envio: dc.date.issued | 2023-09-29 | - |
Data de envio: dc.date.issued | 2023-09-29 | - |
Data de envio: dc.date.issued | 2017 | - |
Fonte completa do material: dc.identifier | http://app.uff.br/riuff/handle/1/30660 | - |
Fonte: dc.identifier.uri | http://educapes.capes.gov.br/handle/capes/765282 | - |
Descrição: dc.description | O controle dos desvios e o cumprimento do prazo inicialmente planejado é um dos maiores desafios enfrentados pelos gerentes de projetos. Muitas metodologias e ferramentas foram desenvolvidas ao longo dos anos para auxiliar a gestão do tempo de forma eficaz, porém ainda existem muitos problemas relatados devido ao alto número de eventos ocorridos durante a execução. A metodologia da Corrente Crítica desenvolvida por Eliyahu M. Goldratt tem obtido destaque, pois de uma forma inovadora pretende eliminar os desperdícios ocorridos nos projetos e através da introdução de pulmões garante o monitoramento dos desvios e o impacto gerado por eles. Baseada na Teoria das Restrições e aplicada ao ambiente de projetos, essa ferramenta permite que o gerente tome decisões e realize ajustes baseado nos indicadores de consumo e desempenho dos pulmões. O presente estudo tem como propósito apresentar a aplicação prática da corrente crítica demonstrando um comparativo entre o método convencionalmente utilizado, através de um estudo de caso em projetos de manutenção de equipamentos em uma empresa do segmento de petróleo e gás | - |
Descrição: dc.description | Deviations control and compliance with the initially planned deadline and one of the biggest challenges faced by project managers. Many methodologies and tools have been developed over the years to help manage time effectively, there are still problems related to the high number of events that occur during execution. The Critical Chain methodology developed by Eliyahu M. Goldratt has been recognize, in an innovative way, intend to eliminate waste and through the introduction of lungs ensures the monitoring of deviations and the impact generated by them. Based on the Theory of Constraints and application in the project environment, this tool allows the manager to make decisions and make adjustments to our consumption indicators and lung performance. The present study aims to present the practical application of the critical current demonstrating a comparison between the conventionally used method, through a case study in maintenance projects of equipment in an oil and gas company | - |
Descrição: dc.description | 114 f. | - |
Formato: dc.format | application/pdf | - |
Formato: dc.format | application/pdf | - |
Idioma: dc.language | pt_BR | - |
Publicador: dc.publisher | Rio das Ostras | - |
Direitos: dc.rights | Open Access | - |
Direitos: dc.rights | http://creativecommons.org/licenses/by-nc-nd/3.0/br/ | - |
Direitos: dc.rights | CC-BY-SA | - |
Palavras-chave: dc.subject | Corrente crítica | - |
Palavras-chave: dc.subject | Gestão de projetos | - |
Palavras-chave: dc.subject | Gestão do tempo | - |
Palavras-chave: dc.subject | Teoria das restrições | - |
Palavras-chave: dc.subject | Manutenção de equipamentos | - |
Palavras-chave: dc.subject | Engenharia de Produção | - |
Palavras-chave: dc.subject | Gestão de processos de negócio | - |
Palavras-chave: dc.subject | Teoria das restrições | - |
Palavras-chave: dc.subject | Manutenção de máquina | - |
Palavras-chave: dc.subject | Critical chain | - |
Palavras-chave: dc.subject | Project management | - |
Palavras-chave: dc.subject | Time management | - |
Palavras-chave: dc.subject | Theory of constrain | - |
Palavras-chave: dc.subject | Equipment maintenance | - |
Título: dc.title | A corrente crítica: uma nova abordagem do gerenciamento de tempos aplicada a projetos de manutenção em equipamentos submarinos | - |
Tipo de arquivo: dc.type | Trabalho de conclusão de curso | - |
Aparece nas coleções: | Repositório Institucional da Universidade Federal Fluminense - RiUFF |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: