Autor(es): dc.contributor | Pessin, Juliana | - |
Autor(es): dc.contributor | Saramago, Robson Palhas | - |
Autor(es): dc.contributor | França, Sergio Luiz Braga | - |
Autor(es): dc.creator | Machado, Louise Recla Pereira | - |
Data de aceite: dc.date.accessioned | 2024-07-11T17:41:09Z | - |
Data de disponibilização: dc.date.available | 2024-07-11T17:41:09Z | - |
Data de envio: dc.date.issued | 2023-12-26 | - |
Data de envio: dc.date.issued | 2023-12-26 | - |
Fonte completa do material: dc.identifier | http://app.uff.br/riuff/handle/1/31681 | - |
Fonte: dc.identifier.uri | http://educapes.capes.gov.br/handle/capes/755366 | - |
Descrição: dc.description | Obras de engenharia sofrem a influência de fatores internos e externos, conferindo a elas uma série de incertezas com potencial de afetar seus objetivos. No caso da Engenharia Geotécnica, também são influenciadas por fatores ambientais característicos do local da obra, como a estabilidade do terreno, a incerteza sobre as propriedades do material geológico e a variação das condições climáticas. Visto a complexidade desses projetos é oportuna a utilização de ferramentas de gerenciamento de riscos, que auxiliem a identificação, análise e avaliação de cada evento incerto, permitindo um maior entendimento do seu contexto e auxiliando o gerenciamento de custos e prazos. Desta forma, o objetivo deste trabalho é desenvolver uma metodologia para aplicação da técnica de análise preliminar de riscos (APR) ainda na fase de elaboração da proposta, possibilitando o planejamento de contingências e planos de ação que mitiguem os impactos futuros ainda nesta etapa. Além disso, será proposto um guia de identificação de riscos, que tem a função de auxiliar o mapeamento dos eventos incertos com base nas fontes principais de risco de um projeto, permitindo uma identificação abrangente e reduzindo a possibilidade negligenciar pontos importantes. A metodologia proposta será aplicada em um projeto real de contenção do tipo solo grampeado. Cada risco mapeado será avaliado de acordo com sua probabilidade e impacto, e como resultado, será obtido o nível de influência de cada risco no projeto. Por fim, serão propostos planos de ação para cada risco mapeado. | - |
Descrição: dc.description | Engineering works are influenced by internal and external factors, giving them a series of uncertainties with the potential to affect their objectives. In the case of Geotechnical Engineering, they are also influenced by environmental factors characteristic of the construction site, such as the stability of the terrain, uncertainty about the properties of the geological material and variation in climatic conditions. Given the complexity of these projects, it is appropriate to use risk management tools that help identify, analyze and evaluate each uncertain event, allowing a greater understanding of their context and helping to manage costs and deadlines. Therefore, the objective of this work is to develop a methodology for applying the preliminary risk analysis (PRA) technique during the proposal preparation phase, enabling contingency planning and action plans that mitigate future impacts at this stage. Furthermore, a risk identification guide will be proposed, which has the function of helping to map uncertain events based on the main sources of risk in a project, allowing a comprehensive identification and reducing the possibility of neglecting important points. The proposed methodology will be applied to a real soil-stapled containment project. Each mapped risk will be evaluated according to its probability and impact, and as a result, the level of influence of each risk on the project will be obtained. Finally, action plans will be proposed for each risk mapped. | - |
Descrição: dc.description | 79 p. | - |
Formato: dc.format | application/pdf | - |
Idioma: dc.language | pt_BR | - |
Direitos: dc.rights | Open Access | - |
Direitos: dc.rights | CC-BY-SA | - |
Palavras-chave: dc.subject | Risco | - |
Palavras-chave: dc.subject | Gerenciamento de riscos | - |
Palavras-chave: dc.subject | Análise preliminar de riscos | - |
Palavras-chave: dc.subject | Obras de geotecnia | - |
Palavras-chave: dc.subject | Solo grampeado | - |
Palavras-chave: dc.subject | Administração de risco | - |
Palavras-chave: dc.subject | Análise de risco | - |
Palavras-chave: dc.subject | Geotecnia | - |
Palavras-chave: dc.subject | Solo | - |
Palavras-chave: dc.subject | Risk | - |
Palavras-chave: dc.subject | Risk management | - |
Palavras-chave: dc.subject | Preliminary risk analysis | - |
Palavras-chave: dc.subject | Geotechnical works | - |
Palavras-chave: dc.subject | Soil nailing | - |
Título: dc.title | Modelo de gerenciamento de riscos para uma obra de solo grampeado | - |
Tipo de arquivo: dc.type | Trabalho de conclusão de curso | - |
Aparece nas coleções: | Repositório Institucional da Universidade Federal Fluminense - RiUFF |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: