Influência do building information modeling (BIM) no desempenho de prazos em projeto de obras industriais

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorFerreira, Miguel Luiz Ribeiro-
Autor(es): dc.contributorMoreira, Roger Matsumoto-
Autor(es): dc.contributorSilva, Walber Paschoal da-
Autor(es): dc.contributorSantos, Eduardo Toledo-
Autor(es): dc.contributorhttp://lattes.cnpq.br/4629163917401135-
Autor(es): dc.creatorPereira, Leonardo Pessanha de Azevedo-
Data de aceite: dc.date.accessioned2024-07-11T17:32:31Z-
Data de disponibilização: dc.date.available2024-07-11T17:32:31Z-
Data de envio: dc.date.issued2023-09-05-
Data de envio: dc.date.issued2023-09-05-
Fonte completa do material: dc.identifierhttp://app.uff.br/riuff/handle/1/30241-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/capes/752407-
Descrição: dc.descriptionO objetivo deste trabalho é comparar o desempenho de prazo na elaboração de projetos de engenharia de dois empreendimentos que utilizaram a metodologia Building Information Modeling (BIM), com outros dois que não a adotaram. O foco do estudo é o processo de elaboração de projeto de fundações de bombas em obras industriais na área de refino de petróleo. Na realização da pesquisa, adaptou-se o Método de Estudo de Caso às condições da amostra estudada composta por obras concluídas, onde se utilizou como instrumentos de pesquisa: entrevistas presenciais com base em questionário semiestruturado e análise documental. Objetivando apoiar a análise qualitativa, realizou-se uma análise quantitativa dos dados de prazo de cada uma das etapas e do total do projeto. Nesta análise, avaliou-se os comportamentos dos prazos de cada uma das etapas e do prazo total dos projetos estudados, utilizando a simulação de Monte Carlo como ferramenta de apoio. Também se avaliou a existência ou não da influência entre os prazos de cada etapa entre si e com os prazos totais dos projetos, utilizando como instrumento de análise a correlação Spearman. A realização da análise quantitativa utilizou os recursos dos softwares @Risk 8.2 e StatTools 8.2 da Palisade Corporation. Ao contrário do que é amplamente mencionado na literatura, o estudo evidenciou, levando-se em conta as limitações da amostra estudada, que não houve redução de prazo de elaboração do projeto de engenharia, nas obras que utilizaram BIM em comparação àquelas que não empregaram esta metodologia.-
Descrição: dc.descriptionThe aim of this work is to compare the deadline performance in the elaboration of engineering design of two projects that used the Building Information Modeling (BIM) methodology, with two others that did not adopt it. The focus of the study is the process of developing an engineering design of bomb foundations in industrial works of oil industry. In the research, the Case Study Method was adapted to the conditions of the studied sample composed of completed works, using as research instruments: face-to-face interviews based on a semi-structured questionnaire and documentary analysis. Aiming to support qualitative analysis, one conducted a quantitative analysis of the term data of each of the stages and the total of the project. In this analysis, it evaluated the behaviors of the deadlines of each of the stages and of the total projects’ terms, using the Monte Carlo simulation as a support tool. One evaluated the existence or not of the influence between the deadlines of each stage and with the total deadlines of the projects, using as an instrument of analysis the Spearman correlation. The quantitative analysis used the resources of the software @Risk 8.2 and StatTools 8.2 of Palisade Corporation. Despite to what is widely mentioned in the literature, the study showed, considering the limitations of the sample studied, that there was no reduction in the deadlines for the elaboration of engineering designs in the works that used BIM methodology.-
Descrição: dc.description146 p.-
Formato: dc.formatapplication/pdf-
Idioma: dc.languagept_BR-
Direitos: dc.rightsOpen Access-
Direitos: dc.rightsCC-BY-SA-
Palavras-chave: dc.subjectProjeto de Engenharia-
Palavras-chave: dc.subjectBIM-
Palavras-chave: dc.subjectDesempenho de Prazo-
Palavras-chave: dc.subjectSimulação de Monte Carlo-
Palavras-chave: dc.subjectModelagem de informação da construção-
Palavras-chave: dc.subjectProjeto de fundação-
Palavras-chave: dc.subjectBomba (Máquina)-
Palavras-chave: dc.subjectEngineering Design-
Palavras-chave: dc.subjectBuilding Information Modeling (BIM)-
Palavras-chave: dc.subjectDeadline Behaviour-
Palavras-chave: dc.subjectMonte Carlo Simulation-
Título: dc.titleInfluência do building information modeling (BIM) no desempenho de prazos em projeto de obras industriais-
Tipo de arquivo: dc.typeDissertação-
Aparece nas coleções:Repositório Institucional da Universidade Federal Fluminense - RiUFF

Não existem arquivos associados a este item.