Análise de fluxo de potência em barramentos e curto circuito de subestação extra alta tensão para dimensionamento de equipamentos

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorMonteiro, Paulo Roberto Duailibe-
Autor(es): dc.contributorBorges, Thiago Trezza-
Autor(es): dc.contributorMachado, Lora Galeano-
Autor(es): dc.creatorBarbosa Filho, Marcio Antonio Ribeiro-
Data de aceite: dc.date.accessioned2024-07-11T17:32:31Z-
Data de disponibilização: dc.date.available2024-07-11T17:32:31Z-
Data de envio: dc.date.issued2021-09-13-
Data de envio: dc.date.issued2021-09-13-
Data de envio: dc.date.issued2020-
Fonte completa do material: dc.identifierhttps://app.uff.br/riuff/handle/1/23187-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/capes/752406-
Descrição: dc.descriptionO sistema elétrico brasileiro, composto em sua maior parte pelo de Sistema Interligado Nacional (SIN), necessita de um planejamento meticuloso e estudos específicos ao se tratar de sua expansão e conexão de novos elementos ao sistema, de forma que as novas conexões não impactem de maneira negativa a operação e confiabilidade do mesmo. Neste trabalho, são realizados os estudos de fluxo de potência em barramentos e curto-circuito para duas subestações (SE) de 500 kV que fazem parte de um empreendimento com previsão de conexão ao SIN no ano de 2025. A nova conexão resume-se em uma usina eólica localizada na Bahia, cuja geração será absorvida por uma SE 500 kV coletora, e se conectará ao SIN através de uma SE 500 kV seccionadora, responsável pelo seccionamento da LT 500 kV Paulo Afonso IV – Olindina. Os estudos de fluxo de potência e curto-circuito são realizados utilizando as bases de dados disponibilizadas pelo Operador Nacional do Sistema Elétrico (ONS) e pela Empresa de Pesquisa Energética (EPE), e tem o objetivo identificar as correntes nominais que circulam pela subestação e correntes de curto-circuito no ponto de conexão do empreendimento, respectivamente. Assim, tornando possível a especificação técnica de parâmetros elétricos de chaves seccionadoras e disjuntores que integram as subestações mencionadas.-
Descrição: dc.descriptionThe brazillian electrical system, also know as Sistema Interligado Nacional (SIN), requires careful planning and specific studies when looking after it’s expansion and conection of new elements to the system, in a way that new connections won’t negatively impact the operation and reliability of itself. In this work, power flow at buses and short circuit analisis are done for two 500 kV substations (SE) that are part of an development with conection to SIN predicted to the year of 2025. The new conection is a wind plant located at Bahia, and its generation will be absorved by an 500 kV collector SE and is going to be conected to SIN trought an 500 kV switch SE, that is responsable for the sectionation of the 500 kV transmission line Paulo Afonso IV – Olindina. The power flow and short circuit studies are done using data bases made available by Operador Nacional do Sistema Elétrico (ONS) and Empresa de Pesquisa Energética (EPE), and have the purspose of indetify the nominal currents that go throught the substation e the short circuit currents on the conection point, respectively. Thus, making possible the technical specification of electrical parameters of switches and circuit breakers that compose the mentioned substations.-
Formato: dc.formatapplication/pdf-
Idioma: dc.languagept_BR-
Direitos: dc.rightsOpen Access-
Direitos: dc.rightsCC-BY-SA-
Palavras-chave: dc.subjectFluxo de potência-
Palavras-chave: dc.subjectCurto circuito-
Palavras-chave: dc.subjectSubestação-
Palavras-chave: dc.subjectChaves seccionadoras-
Palavras-chave: dc.subjectDisjuntores-
Palavras-chave: dc.subjectFluxo de potência-
Palavras-chave: dc.subjectCurto circuito-
Palavras-chave: dc.subjectSubestação elétrica-
Palavras-chave: dc.subjectPower Flow-
Palavras-chave: dc.subjectShort Circuit-
Palavras-chave: dc.subjectSubstations-
Palavras-chave: dc.subjectSwitchers-
Palavras-chave: dc.subjectCircuit breakers-
Título: dc.titleAnálise de fluxo de potência em barramentos e curto circuito de subestação extra alta tensão para dimensionamento de equipamentos-
Tipo de arquivo: dc.typeTrabalho de conclusão de curso-
Aparece nas coleções:Repositório Institucional da Universidade Federal Fluminense - RiUFF

Não existem arquivos associados a este item.