Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
Autor(es): dc.contributor | Thielmann, Ricardo | - |
Autor(es): dc.contributor | Amaral, Marcelo Gonçalves do | - |
Autor(es): dc.contributor | Eller Junior, Edgar | - |
Autor(es): dc.creator | Santos, Felipe Assumpção | - |
Autor(es): dc.creator | Freitas, Thaísa Corrêa Curty | - |
Data de aceite: dc.date.accessioned | 2024-07-11T17:31:12Z | - |
Data de disponibilização: dc.date.available | 2024-07-11T17:31:12Z | - |
Data de envio: dc.date.issued | 2021-05-11 | - |
Data de envio: dc.date.issued | 2021-05-11 | - |
Data de envio: dc.date.issued | 2019 | - |
Fonte completa do material: dc.identifier | https://app.uff.br/riuff/handle/1/22007 | - |
Fonte: dc.identifier.uri | http://educapes.capes.gov.br/handle/capes/751958 | - |
Descrição: dc.description | Este artigo tem como objetivo descrever a gestão de projeto de implantação e atualização de equipamento UTM FortiGate® 300D na UFF, tendo como base o guia de projetos PMBOK®. Trata-se de um projeto de configuração do atual hardware, incompatível com o perfil de tráfego e de usuários, na área de Tecnologia da Informação da UFF. Por conta da incompatibilidade, o equipamento opera acima da capacidade recomendada, podendo causar a indisponibilidade de serviços essenciais. Para alcançar os objetivos, foi realizado o Termo de Abertura de Projeto, para viabilizar e formalizar as necessidades do projeto; posteriormente montou-se a WBS, que é um processo de subdivisão das entregas; e ainda o uso do software MS Project para o auxílio do planejamento e controle do cronograma; além de uma análise bibliográfica em artigos científicos. A finalidade do projeto é a substituição do equipamento e atualização das funcionalidades, ampliando assim os serviços disponibilizados pelo STI/VCX. Como resultado, espera-se o gerenciamento de um volume duas vezes maior de sessões simultâneas de acesso à rede e maior taxa de transferência de Firewall, IPS e controle de aplicações, o que se traduzem em aumento capacidade de usuários conectados simultaneamente à internet, aumento na velocidade de acesso percebida pelo usuário e maior capacidade da unidade de gerenciar os pacotes de dados. Assim os serviços prestados gozarão de maior confiabilidade e de estrutura para os planos de expansão de médio e longo prazo | - |
Descrição: dc.description | This paper aims to describe the management of the UTM FortiGate® 300D appliance update project at the UFF, based on the PMBOK® guide. A project that copes with the shaping of the current hardware, which has an inconsistent profile of data and users traffic, in the department of Information Technology at UFF. Given the incompatibility, the equipment operates above it’s recommended capacity, occasionally causing vital services to cease to function. In order to achieve the objectives, firstly the Project Charter was written down, to enable and formalize the needs of the project; later the WBS was set up, which is a process of subdivision of deliveries; the use of the MS Project software was also required to assist and meet the needs of the schedule; besides a bibliographical analysis of scientific articles was done. The main purpose of the project is to replace the equipment and update the high availability features, increasing the services made available by the STI/VCX. As a result, an increase of twice bigger in volume on simultaneous sessions of network access and a largest transfer rate by Firewall, IPS and applications control is expected, translating into a growth in capacity in terms of users connected to the internet simultaneously, a growth in speed of access to the user and a higher capacity for the unit to manage the data packages. That way, the sector can provide services with even greater reliability and have a greater apparatus for the medium-term expansion plans | - |
Formato: dc.format | application/pdf | - |
Formato: dc.format | application/pdf | - |
Idioma: dc.language | pt_BR | - |
Direitos: dc.rights | Open Access | - |
Direitos: dc.rights | http://creativecommons.org/licenses/by-nc-nd/3.0/br/ | - |
Direitos: dc.rights | CC-BY-SA | - |
Palavras-chave: dc.subject | Gestão | - |
Palavras-chave: dc.subject | Projetos | - |
Palavras-chave: dc.subject | PMBOK® | - |
Palavras-chave: dc.subject | Universidade Federal Fluminense | - |
Palavras-chave: dc.subject | Gestão de projeto | - |
Palavras-chave: dc.subject | Planejamento | - |
Palavras-chave: dc.subject | Management | - |
Palavras-chave: dc.subject | Projects | - |
Título: dc.title | Gestão de projeto público utilizando o PMBOK®: estudo sobre a implantação de equipamento de rede em um campus da Universidade Federal Fluminense | - |
Tipo de arquivo: dc.type | Trabalho de conclusão de curso | - |
Aparece nas coleções: | Repositório Institucional da Universidade Federal Fluminense - RiUFF |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: