Análise da exigência física do trabalho em fábricas de móveis no Distrito Federal

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.creatorFiedler, Nilton César-
Autor(es): dc.creatorMenezes, Natália Santiago de-
Autor(es): dc.creatorMinetti, Luciano José-
Autor(es): dc.creatorMartins, Ildeu Soares-
Data de aceite: dc.date.accessioned2021-10-14T18:01:59Z-
Data de disponibilização: dc.date.available2021-10-14T18:01:59Z-
Data de envio: dc.date.issued2012-05-23-
Data de envio: dc.date.issued2012-05-23-
Data de envio: dc.date.issued2003-11-
Fonte completa do material: dc.identifierhttp://repositorio.unb.br/handle/10482/10535-
Fonte completa do material: dc.identifierhttp://dx.doi.org/10.1590/S0100-67622003000600014-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/capes/621975-
Descrição: dc.descriptionA presente pesquisa foi realizada em fábricas de móveis no Distrito Federal, com o objetivo de avaliar a carga de trabalho físico dos funcionários nas funções de operador de aparadora, coladora de bordas, desengrossadeira, esquadrejadeira, furadeira, lixadeira, plaina, prensa, seccionadeira, serra circular, serra de fita, torno e tupia. A carga de trabalho físico foi obtida através do levantamento da freqüência cardíaca no trabalho. As atividades exercidas pelos operadores de desengrossadeira foram classificadas como pesadas, as exercidas pelos operadores de plaina e serra circular como moderadamente pesadas, enquanto as demais foram classificadas como de exigência física leve. Para haver um desempenho contínuo no trabalho sem desgaste, os operadores precisam de uma pausa média de 16 minutos por hora trabalhada na desengrossadeira e de 2,5 minutos na plaina. ____________________________________________________________________________________ ABSTRACT-
Descrição: dc.descriptionThis research was carried out in a carpentry in Brasília, F.D. (Brazil) aiming to evaluate the physical work load of the employees in different furniture manufacturing activities. Physical work load was obtained by assessing cardiac frequency at work. The activities performed by the ax operators were classified as heavy while those performed by the plane and circular saw operators as moderately heavy, with the remaining activities being classified as light. It was concluded that in order to achieve an adequate continuous performance at work, ax operators need to have an average break period of 16 minutes per hour, and plane operators a break periods of 2.5 minutes.-
Formato: dc.formatapplication/pdf-
Publicador: dc.publisherSociedade de Investigações Florestais-
Direitos: dc.rightsAcesso Aberto-
Direitos: dc.rightsRevista Árvore - Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons (Attribution-NonCommercial 3.0 Unported (CC BY-NC 3.0)). Fonte: http://www.scielo.br/scielo.php?script=sci_serial&pid=0100-6762&lng=pt&nrm=iso. Acesso em: 21 maio 2012.-
Palavras-chave: dc.subjectIndústria de móveis-
Palavras-chave: dc.subjectPadrões de produção-
Palavras-chave: dc.subjectProdutividade do trabalho-
Palavras-chave: dc.subjectSaúde e trabalho-
Palavras-chave: dc.subjectErgonomia-
Título: dc.titleAnálise da exigência física do trabalho em fábricas de móveis no Distrito Federal-
Título: dc.titlePhysical requirements in carpentry in Brasília - Brazil-
Tipo de arquivo: dc.typelivro digital-
Aparece nas coleções:Repositório Institucional – UNB

Não existem arquivos associados a este item.