Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
???dc.contributor.advisor???: dc.contributor.advisor | Benetti, Heloiza Aparecida Piassa | - |
Autor(es): dc.contributor.author | Freisleben, Patrícia Luiza Moscon | - |
Autor(es): dc.contributor.author | Ronda, Tatiane | - |
Data de aceite: dc.date.accessioned | 2015-04-06T02:17:25Z | - |
Data de aceite: dc.date.accessioned | 2017-03-17T14:43:29Z | - |
Data de disponibilização: dc.date.available | 2017-03-17T14:43:29Z | - |
Fonte completa do material: dc.identifier | http://repositorio.roca.utfpr.edu.br/jspui/handle/1/3396 | - |
???dc.identifier.citation???: dc.identifier.citation | FREISLEBEN, Patrícia Luiza Moscon; RONDA, Tatiane. Construção enxuta: análise e aplicação dos princípios em empresa de pré-moldados. 2014. 79 f. Trabalho de Conclusão de Curso (Graduação) - Universidade Tecnológica Federal do Paraná, Pato Branco, 2014. | pt_BR |
Fonte: dc.identifier.uri | http://www.educapes.capes.gov.br/handlecapes/172127 | - |
Resumo: dc.description.abstract | The precast elements are considered technological innovation in Civil Construction and every day get more importance in the face of an increasingly demanding market with the final product quality, imposing further limit to deadlines. Therefore the improvement of construction techniques and materials used is required. The manufacturing process of pre molded parts in building aims to optimize the time in production of the parts, lower costs and the complete elimination of wastage, also seeking the reduction of the workforce. The objective of this study was to analyze the manufacture of precast pillars of a company and, from this analysis hold a current Value Stream Map of this process. From this map it was possible to analyze the critical points of the process, in sequence from the point of view of Lean Construction to point out improvements, based on its principles, which result in greater efficiency in production. These improvements have been implemented in the new Value Stream Map which shows that by using the improvements suggested the company could achieve productivity gains, cost savings and eliminate most waste, both in manpower as time and materials. | pt_BR |
Palavras-chave: dc.subject | Concreto pré-moldado | pt_BR |
Palavras-chave: dc.subject | Produção enxuta | pt_BR |
Palavras-chave: dc.subject | Construção civil | pt_BR |
Palavras-chave: dc.subject | Precast concrete | pt_BR |
Palavras-chave: dc.subject | Lean manufacturing | pt_BR |
Palavras-chave: dc.subject | Building | pt_BR |
Título: dc.title | Construção enxuta: análise e aplicação dos princípios em empresa de pré-moldados | pt_BR |
Tipo de arquivo: dc.type | outro | pt_BR |
Aparece nas coleções: | Repositorio Institucional da UTFPR - RIUT |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: