Análise comparativa entre o não cumprimento da NR-18 e de sua adequação em uma obra de construção civil

Registro completo de metadados
MetadadosDescriçãoIdioma
???dc.contributor.advisor???: dc.contributor.advisorCatai, Rodrigo Eduardo-
Autor(es): dc.contributor.authorSakamoto Júnior, Kasuo-
Data de aceite: dc.date.accessioned2015-04-17T17:15:23Z-
Data de aceite: dc.date.accessioned2017-03-17T14:42:10Z-
Data de disponibilização: dc.date.available2015-04-17T17:15:23Z-
Data de disponibilização: dc.date.available2017-03-17T14:42:10Z-
Fonte completa do material: dc.identifierhttp://repositorio.roca.utfpr.edu.br/jspui/handle/1/3483-
???dc.identifier.citation???: dc.identifier.citationSAKAMOTO JÚNIOR, Kasuo. Análise comparativa entre o não cumprimento da NR-18 e de sua adequação em uma obra de construção civil. 2014. 53 f. Trabalho de Conclusão de Curso (Especialização) – Universidade Tecnológica Federal do Paraná, Curitiba, 2014.pt_BR
Fonte: dc.identifier.urihttp://www.educapes.capes.gov.br/handlecapes/171611-
Resumo: dc.description.abstractThe construction industry is a high risk of accidents occurring continues causing harm to the employee , the company and the government and it becomes important to assess the adequacy of the standard to this situation . The overall objective of this monograph is to know the costs levied on construction works in the city of Curitiba , Paraná , covering NR -18 and thus identify the benefits for both the company and for its employees in the implementation and greetings items established by the respective regulatory norm . First we tried to make a bibliographical research . To this end, several authors have been consulted and culminated in a cost analysis that are generated through prevention and accident. The methodology used to identify the costs of workplace safety was the application of a checklist on the NR -18 based on the application of NR -28 , which regulates the inspections and penalties . The results indicated the items of the standard is more difficult to be fulfilled by the company ; verification that the causes of failure are more managerial nature and culture workers than the rigor of the requirements in the standard . It was concluded from the information that analyzed the costs to implement the NR -18 corresponds to 1.5 to 3.0 % of the total cost of the work , so investments in the area of workplace safety are offset by gains in productivity employees and better working conditions and safety for employees.pt_BR
Palavras-chave: dc.subjectConstrução civil - Medidas de segurançapt_BR
Palavras-chave: dc.subjectConstrução civil - Normaspt_BR
Palavras-chave: dc.subjectSegurança do trabalhopt_BR
Palavras-chave: dc.subjectBuilding - Safety measurespt_BR
Palavras-chave: dc.subjectBuilding - Standardspt_BR
Palavras-chave: dc.subjectIndustrial safetypt_BR
Título: dc.titleAnálise comparativa entre o não cumprimento da NR-18 e de sua adequação em uma obra de construção civilpt_BR
Tipo de arquivo: dc.typeoutropt_BR
Aparece nas coleções:Repositorio Institucional da UTFPR - RIUT

Não existem arquivos associados a este item.