Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
???dc.contributor.advisor???: dc.contributor.advisor | Romano, Cezar Augusto | - |
Autor(es): dc.contributor.author | Cazelato, Fernanda Faria | - |
Data de aceite: dc.date.accessioned | 2015-03-13T17:02:28Z | - |
Data de aceite: dc.date.accessioned | 2017-03-17T14:41:59Z | - |
Data de disponibilização: dc.date.available | 2015-03-13T17:02:28Z | - |
Data de disponibilização: dc.date.available | 2017-03-17T14:41:59Z | - |
Fonte completa do material: dc.identifier | http://repositorio.roca.utfpr.edu.br/jspui/handle/1/3159 | - |
???dc.identifier.citation???: dc.identifier.citation | CAZELATO, Fernanda Faria. Análise da correlação entre atrasos de cronograma e retrabalhos em obras de edíficio de multíplos apartamentos na região metropolitana de Curitiba. 2014. 45 f. Trabalho de Conclusão de Curso (Especialização) – Universidade Tecnológica Federal do Paraná, Curitiba, 2014. | pt_BR |
Fonte: dc.identifier.uri | http://www.educapes.capes.gov.br/handlecapes/171571 | - |
Resumo: dc.description.abstract | Currently the construction industry has suffered from delays in construction schedules, and result in losses and overspending. Therefore, a good planning is fundamental activity to the sucess of any enterprise. At the beginning and throughout the duration of the work, it ensures, based on estimates drawn a favorable probability with the expected results. One of the biggest wastes in this area are the rework and the lack of standard in performing services. Thus, it is possible to consider that performing rework is a cultural problem in construction. This practice is accepted in many cases and results in defective works in the final product, which therefore undermines the image of the company. Thus, the aim of this monograph is to show the correlation between the delays of the planned construction schedule with high levels of rework certain services. Through the case, planned and executed schedules were analyzed and compared to the percentage of rework. So to consider that the lack of to standardization and control of processes is directly related to the delays. The results were conclusive that the importance of services executed in a responsible standardized and controlled so that the rework be avoided manner. | pt_BR |
Palavras-chave: dc.subject | Planejamento | pt_BR |
Palavras-chave: dc.subject | Controle de qualidade | pt_BR |
Palavras-chave: dc.subject | Construção civil | pt_BR |
Palavras-chave: dc.subject | Planning | pt_BR |
Palavras-chave: dc.subject | Quality control | pt_BR |
Palavras-chave: dc.subject | Building | pt_BR |
Título: dc.title | Análise da correlação entre atrasos de cronograma e retrabalhos em obras de edíficio de multíplos apartamentos na região metropolitana de Curitiba | pt_BR |
Tipo de arquivo: dc.type | outro | pt_BR |
Aparece nas coleções: | Repositorio Institucional da UTFPR - RIUT |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: