Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
???dc.contributor.advisor???: dc.contributor.advisor | Akita, Juvenal | - |
???dc.contributor.advisor???: dc.contributor.advisor | Maia, José da Silva | - |
Autor(es): dc.contributor.author | Buch Junior, Antonio Carlos | - |
Autor(es): dc.contributor.author | Grunewalder, Marcos | - |
Data de aceite: dc.date.accessioned | 2014-09-10T19:07:23Z | - |
Data de aceite: dc.date.accessioned | 2017-03-17T14:40:30Z | - |
Data de disponibilização: dc.date.available | 2014-09-10T19:07:23Z | - |
Data de disponibilização: dc.date.available | 2017-03-17T14:40:30Z | - |
Data de envio: dc.date.issued | 2014-09-10 | - |
Fonte completa do material: dc.identifier | http://repositorio.roca.utfpr.edu.br/jspui/handle/1/2366 | - |
???dc.identifier.citation???: dc.identifier.citation | BUCH JUNIOR, Antonio Carlos; GRUNEWALDER, Marcos. Desenvolvimento de um concentrador de dados via software elipse scada para ensaio de desempenho em usina termelétrica –Estudo de caso. 2013. 71 f. Trabalho de Conclusão de Curso (Graduação) – Universidade Tecnológica Federal do Paraná, Curitiba, 2013. | pt_BR |
Fonte: dc.identifier.uri | http://www.educapes.capes.gov.br/handlecapes/171011 | - |
Resumo: dc.description.abstract | By ANEEL determination, the thermoelectric units must be inspected to determine the effective "installed" power and "net" power in order to record the available capacity to the electrical system. If the data obtained in the performance essay are in disagreement with the conditions and obligations, shall subject the violator to fines and administrative penalties. The inspections are done by means of performance tests on each power generating unit -as normative resolution 420/2010 from ANEEL. Measurements are made with certified power metering devices. Are used at least three metering devices, as follows: one for each generating unit, one for the auxiliary services (offices, maintenance shops, street lighting, etc.) and one for the connection point with the electric power utility. In order to implement a system that optimizes the data collection and concentrate the data obtained,from all the multimetersused in the performance test, will be test the application of an automation software to achieve the expected efficiency, and to meet the standard 420/2010 from ANEEL-systematic determination of the "Installed Capacity" and "Net Power" enterprise of generating electricity for the purpose of licensing, regulation and inspection services power generation. | pt_BR |
Palavras-chave: dc.subject | Armazenamento de dados | pt_BR |
Palavras-chave: dc.subject | Software - Desenvolvimento | pt_BR |
Palavras-chave: dc.subject | Energia - Fontes alternativas | pt_BR |
Palavras-chave: dc.subject | Data Warehousing | pt_BR |
Palavras-chave: dc.subject | Computer software - Development | pt_BR |
Palavras-chave: dc.subject | Renewable energy sources | pt_BR |
Título: dc.title | Desenvolvimento de um concentrador de dados via software Elipse Scada para ensaio de desempenho em usina termelétrica: estudo de caso | pt_BR |
Tipo de arquivo: dc.type | outro | pt_BR |
Aparece nas coleções: | Repositorio Institucional da UTFPR - RIUT |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: