Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
???dc.contributor.advisor???: dc.contributor.advisor | Tabalipa, Ney Lyzandro | - |
Autor(es): dc.contributor.author | Pagoto, Marcos Vinícius | - |
Autor(es): dc.contributor.author | Camicia, Rodrigo Junior da Motta | - |
Data de aceite: dc.date.accessioned | 2013-06-15T13:28:51Z | - |
Data de aceite: dc.date.accessioned | 2017-03-17T14:06:03Z | - |
Data de disponibilização: dc.date.available | 2013-06-15T13:28:51Z | - |
Data de disponibilização: dc.date.available | 2017-03-17T14:06:03Z | - |
Data de envio: dc.date.issued | 2013-06-15 | - |
Fonte completa do material: dc.identifier | http://repositorio.roca.utfpr.edu.br/jspui/handle/1/852 | - |
???dc.identifier.citation???: dc.identifier.citation | PAGOTO, Marcos Vinícius; CAMICIA, Rodrigo Junior da Motta. Avaliação dos aspectos técnicos e econômicos entre estruturas pré-fabricadas e moldadas in loco. 2013. 47 f. Trabalho de Conclusão de Curso (Graduação) - Universidade Tecnológica Federal do Paraná, Pato Branco, 2013. | pt_BR |
Fonte: dc.identifier.uri | http://www.educapes.capes.gov.br/handlecapes/167951 | - |
Resumo: dc.description.abstract | Some alternatives are emerging to industrialize construction. Precast elements are an option, combining speed of execution, strict quality control and high organizational level of production. In this work, we carried out a comparison of execution costs between precast structures and molded on the spot for a residence of 2 floors. To obtain the results, the methodology used was market research, requesting budgets of companies specializing in the area of both structures as precast structures molded on the spot. Making a budget average cost of both construction processes, we have reached a value 4% more expensive for the precast structure. The precast, even though more expensive, it was considered advantageous for the study case. The economic advantage can not be restricted only to the gross cost of construction should take into consideration the time of execution, quality control and reliability of materials and construction process, optimization of the work, which generate savings in construction site, with hand labor and decrease waste. | pt_BR |
Palavras-chave: dc.subject | Construção civil - Estimativas | pt_BR |
Palavras-chave: dc.subject | Concreto pré-moldado | pt_BR |
Palavras-chave: dc.subject | Construção de concreto pré-moldado | pt_BR |
Palavras-chave: dc.subject | Building - Estimates | pt_BR |
Palavras-chave: dc.subject | Precast concrete | pt_BR |
Palavras-chave: dc.subject | Precast concrete construction | pt_BR |
Título: dc.title | Avaliação dos aspectos técnicos e econômicos entre estruturas pré-fabricadas e moldadas in loco | pt_BR |
Tipo de arquivo: dc.type | outro | pt_BR |
Aparece nas coleções: | Repositorio Institucional da UTFPR - RIUT |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: