Modelagem de equipamentos elétricos de pátio de subestação aplicando BIM

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorTerrola e Lopes, Thales-
Autor(es): dc.contributorBorges, Thiago Trezza-
Autor(es): dc.contributorMonteiro, Paulo Roberto Duailibe-
Autor(es): dc.creatorPrates, Ramon Vilar-
Data de aceite: dc.date.accessioned2025-08-21T20:16:39Z-
Data de disponibilização: dc.date.available2025-08-21T20:16:39Z-
Data de envio: dc.date.issued2025-07-31-
Data de envio: dc.date.issued2025-07-31-
Fonte completa do material: dc.identifierhttps://app.uff.br/riuff/handle/1/39556-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/capes/1058067-
Descrição: dc.descriptionEste Trabalho de Conclusão de Curso tem como objetivo aplicar a metodologia BIM (Building Information Modeling) na modelagem de equipamentos elétricos de pátio de subestações com foco na gestão da manutenção. O estudo propõe a criação de famílias paramétricas no Autodesk Revit para representar tridimensionalmente equipamentos como disjuntor, seccionadora, transformador de corrente (TC), transformador de potencial capacitivo (TPC) e para-raios, com a inserção de banco de informações técnicas relevantes para sua gestão, operação e manutenção ao longo do ciclo de vida do equipamento. A metodologia adotada contempla a coleta de dados técnicos a partir de normas e catálogos de fabricantes, seguida da modelagem tridimensional e aplicação de parâmetros. A modelagem foi realizada individualmente para cada equipamento, respeitando suas proporções reais e características construtivas. Após a criação das famílias, estas foram integradas em um projeto completo de um vão típico de subestação em 138 kV, representando um circuito de saída de linha de transmissão. O processo de montagem do vão envolveu o posicionamento espacial dos equipamentos, garantindo coerência entre os pontos de conexão, respeito aos distanciamentos exigidos pelo projeto dos equipamentos elétricos e conformidade com práticas de engenharia. Os resultados demonstram que a adoção do BIM permite uma representação precisa dos equipamentos, bem como a centralização de dados essenciais para futuras intervenções de manutenção preventiva e corretiva. A integração das famílias no modelo tridimensional facilita a visualização espacial, o planejamento de intervenções e o rastreamento das informações técnicas. O estudo conclui que a aplicação do BIM em subestações representa uma importante inovação na gestão dos ativos do sistema elétrico, promovendo maior eficiência, padronização e confiabilidade. Por fim, sugere-se como continuidade o aprofundamento na estruturação dos dados de manutenção e aplicação prática em uma subestação completa.-
Descrição: dc.descriptionThe present work aims to apply the BIM (Building Information Modeling) methodology to the modeling of outdoor high-voltage substation equipment, focusing on maintenance management. The study proposes the creation of parametric families in Autodesk Revit to represent in 3D, equipment such as circuit breakers, disconnect switches, current transformers (CTs), capacitive voltage transformers (CVTs) and surge arresters, including the insertion of a technical information database relevant to their operation, maintenance and lifecycle management. The adopted methodology includes the collection of technical data from standards and manufacturer catalogs, followed by 3D modeling and the application of parameters. Each piece of equipment was modeled individually, respecting real dimensions and construction characteristics. After creating the families, they were integrated into a completemodel of a typical 138 kV substation bay, representing a transmission line exit circuit. The assembly process involved spatial positioning of the equipment, ensuring consistency between connection points, compliance with equipment design clearances, and alignment with engineering practices. The results show that the use of BIM enables accurate equipment representation and centralization of critical data for future preventive and corrective maintenance interventions. The integration of families into the 3D model facilitates spatial visualization, intervention planning and technical information tracking. The study concludes that the application of BIM in substations represents an important innovation in power system asset management, promoting greater efficiency, standardization and reliability. Finally, it is suggested that future work deepens the structuring of maintenance data and applies the methodology in a complete substation project.-
Descrição: dc.description103 f.-
Formato: dc.formatapplication/pdf-
Idioma: dc.languagept_BR-
Direitos: dc.rightsOpen Access-
Direitos: dc.rightsCC-BY-SA-
Palavras-chave: dc.subjectSubestações-
Palavras-chave: dc.subjectManutenção-
Palavras-chave: dc.subjectModelagem 3D-
Palavras-chave: dc.subjectModelagem de informação da construção-
Palavras-chave: dc.subjectImpressão 3D-
Palavras-chave: dc.subjectSubestação elétrica-
Palavras-chave: dc.subjectSubstations-
Palavras-chave: dc.subjectMaintenance-
Palavras-chave: dc.subject3D modeling-
Palavras-chave: dc.subjectBuilding Information Modeling-
Título: dc.titleModelagem de equipamentos elétricos de pátio de subestação aplicando BIM-
Tipo de arquivo: dc.typeTrabalho de conclusão de curso-