Impacto econômico da lavra de barragens.

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.creatorSilva, Paulo Henrique Magalhães-
Autor(es): dc.creatorSilva, Mateus dos Anjos-
Autor(es): dc.creatorSouza, Felipe Ribeiro-
Data de aceite: dc.date.accessioned2025-08-21T15:30:47Z-
Data de disponibilização: dc.date.available2025-08-21T15:30:47Z-
Data de envio: dc.date.issued2022-09-21-
Data de envio: dc.date.issued2022-09-21-
Data de envio: dc.date.issued2019-
Fonte completa do material: dc.identifierhttp://www.repositorio.ufop.br/jspui/handle/123456789/15446-
Fonte completa do material: dc.identifierhttps://doi.org/10.33448/rsd-v9i11.10639-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/capes/1017097-
Descrição: dc.descriptionAlguns acidentes ocasionados pela mineração estão relacionados à disposição dos rejeitos do processo de mineração. Atualmente há um grande debate sobre o melhor método de descomissionar barragens já existentes e armazenar os novos rejeitos. Baseado na análise de custo este projeto foi elaborado com o objetivo de medir a queda no valor do NPV de um empreendimento de mineração de ferro que optou por utilizar o material existente na barragem junto com o material extraído da mina em seu processo de beneficiamento. Utilizando o software NPV Scheduler, que utiliza como princípio de funcionamento o algoritmo de Lerchs e Grossmann, foram produzidos alguns cenários nos modos Single e Multi Mine, os quais foram comparados. Considerando um cenário ideal no ponto de vista econômico para determinar a queda nos lucros causados pelo descomissionamento. Após problemas durante a montagem dos cenários como a geração incorreta de pushbacks e a estacionalização de massas, resolvidos usando alguns cálculos manuais e aplicação de técnicas conhecidas como o Pré Stripping, foi possível definir o impacto econômico gerado pela barragem.-
Descrição: dc.descriptionSome accidents caused by mining are related to the disposal of waste from the mining process. There is currently a great debate about the best method of decommissioning existing dams and storing the new tailings. Based on the cost analysis, this project was developed with the objective of measuring the fall in the NPV value of an iron mining enterprise that chose to use the material existing in the dam together with the material extracted from the mine in its beneficiation process. Using the NPV Scheduler software, which uses the Lerchs and Grossmann algorithm as operating principle, some scenarios were produced in Single and Multi-Mine modes, which were compared. Considering an ideal scenario from an economic point of view to determine the drop in profits caused by decommissioning. After problems during the setting up of scenarios such as the incorrect generation of pushbacks and the massing of masses, solved using some manual calculations and application of techniques known as Pre-Stripping, it was possible to define the economic impact generated by the resumption of the dam.-
Formato: dc.formatapplication/pdf-
Idioma: dc.languagept_BR-
Direitos: dc.rightsaberto-
Direitos: dc.rightsEste trabalho está sob uma Licença Creative Commons Atribuição 4.0 Internacional. Fonte: o PDF do artigo.-
Palavras-chave: dc.subjectPushbacks-
Palavras-chave: dc.subjectSequenciamento-
Palavras-chave: dc.subjectSequencing-
Título: dc.titleImpacto econômico da lavra de barragens.-
Título: dc.titleEconomic impact of dam mining.-
Aparece nas coleções:Repositório Institucional - UFOP

Não existem arquivos associados a este item.