Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
Autor(es): dc.contributor | Scheer, Sérgio, 1957- | - |
Autor(es): dc.contributor | Universidade Federal do Paraná. Setor de Tecnologia. Programa de Pós-Graduação em Engenharia de Construção Civil | - |
Autor(es): dc.creator | Witicovski, Lilian Cristine | - |
Data de aceite: dc.date.accessioned | 2019-08-21T23:23:46Z | - |
Data de disponibilização: dc.date.available | 2019-08-21T23:23:46Z | - |
Data de envio: dc.date.issued | 2018-07-30 | - |
Data de envio: dc.date.issued | 2018-07-30 | - |
Data de envio: dc.date.issued | 2011 | - |
Fonte completa do material: dc.identifier | https://hdl.handle.net/1884/27190 | - |
Fonte: dc.identifier.uri | http://educapes.capes.gov.br/handle/1884/27190 | - |
Descrição: dc.description | Orientador : Prof. Dr. Sérgio Scheer | - |
Descrição: dc.description | Dissertação (mestrado) - Universidade Federal do Paraná, Setor de Tecnologia, Programa de Pós-Graduação em Construção Civil. Defesa: Curitiba, 18/11/2011 | - |
Descrição: dc.description | Bibliografia: fls. 41-42 | - |
Descrição: dc.description | Area de concentração : Gerenciamento | - |
Descrição: dc.description | Resumo: Dentre as competências necessárias para a realização do orçamento verifica-se a relevância do levantamento de quantitativos em projetos e as consequências da qualidade da informação. O mapeamento do fluxo de informações, focado no levantamento de quantitativos, fundamentou-se nas identificações do processo orçamentário, das informações de entrada e saída geradas entre os usuários e participantes do processo, os canais de informação utilizados, o valor e a qualidade da informação. Com seis estudos de casos múltiplos, realizado em dois ciclos da pesquisa, os resultados permitiram entender mais claramente a importância da qualidade das informações contidas em projetos e a sua relação com a gestão do empreendimento durante o seu ciclo de vida. As principais falhas existentes no levantamento de quantitativos e sua relação com as etapas de projeto apresentadas por dois casos que utilizam as representações em 2D, Ciclo 1, foram solucionados a partir das evidências do levantamento de quantitativos automatizado por quatro casos que utilizam BIM, Ciclo 2. Como contribuição, foi possível comparar as várias realidades das construtoras nacionais e analisar o nível de desenvolvimento dos procedimentos de aplicabilidade do BIM. Ideologicamente, pautada nos bons argumentos do referencial teórico sobre temas relacionados ao Fluxo de Informações, CAD, projetos, orçamentos e BIM, além dos pontos positivos apresentados pelos seis casos, foi proposto um fluxo de informações do processo de levantamento de quantitativos em projetos de construção civil com as melhores práticas apresentadas. | - |
Descrição: dc.description | Abstract: Among the skills required to achieve the budget there is the relevance of quantitative assessment of the consequences of projects and quality of information. The mapping of information flow, focused on the quantitative survey, was based on identification of the budget process, the information input and output generated from the users and stakeholders, the information channels used the value and quality of information. With six multiple case studies conducted in two cycles of the survey, the results helped to understand more clearly the importance of quality of information on projects and their relationship with the management of the project during its life cycle. The main flaws in the collection of quantitative and its relation to the stages of the project presented by two cases that use 2D representations, Cycle 1, were resolved from the evidence of the quantitative survey of automated four cases using BIM, Cycle 2. As a contribution, it was possible to compare the various national realities of building and analyzing the level of development of procedures for the use of BIM. Ideologically, based on good theoretical arguments on issues related to information flow, CAD, projects, budgets and BIM, and strengths of the six cases presented, it was proposed a flow of information from the quantitative survey process in construction projects calendar with the best practices presented. | - |
Formato: dc.format | 42f. : il. [algumas color], grafs., tabs. | - |
Formato: dc.format | application/pdf | - |
Formato: dc.format | application/pdf | - |
Relação: dc.relation | Disponível em formato digital | - |
Palavras-chave: dc.subject | Teses | - |
Palavras-chave: dc.subject | Construção civil - Estimativas | - |
Palavras-chave: dc.subject | Modelagem de informação da construção | - |
Palavras-chave: dc.subject | Construçao civil - Processamento de dados | - |
Palavras-chave: dc.subject | Construção civil | - |
Título: dc.title | Levantamento de quantitativos em projeto : uma análise comparativa do fluxo de informações entre as representações em 2D e o modelo de informações da construção (BIM) | - |
Tipo de arquivo: dc.type | livro digital | - |
Aparece nas coleções: | Repositório Institucional - Rede Paraná Acervo |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: