Mitigation strategies for waste elimination and cost reduction in the manufacture of Bowden cables

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorPolytechnic of Porto-
Autor(es): dc.contributorTransports and Aerospace (LAETA-INEGI)-
Autor(es): dc.contributorUniversidade Estadual Paulista (UNESP)-
Autor(es): dc.contributorAvenida Cesare Mansueto Giulio Lattes-
Autor(es): dc.creatorKoch, Luís-
Autor(es): dc.creatorGomes da Silva, Francisco José-
Autor(es): dc.creatorCampilho, Raul Duarte Salgueiral Gomes-
Autor(es): dc.creatorVieira de Sá, José Carlos-
Autor(es): dc.creatorResende Lucas, Rafael-
Autor(es): dc.creatorSales-Contini, Rita de Cássia Mendonça-
Data de aceite: dc.date.accessioned2025-08-21T20:05:54Z-
Data de disponibilização: dc.date.available2025-08-21T20:05:54Z-
Data de envio: dc.date.issued2025-04-29-
Data de envio: dc.date.issued2024-12-31-
Fonte completa do material: dc.identifierhttp://dx.doi.org/10.1007/s00170-025-15367-4-
Fonte completa do material: dc.identifierhttps://hdl.handle.net/11449/303184-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/11449/303184-
Descrição: dc.descriptionThis study aims to describe a new approach to managing the reduction or elimination of cable end waste during the Bowden cable trimming operation in production lines since this waste represents thousands of meters of wasted cable per year, which is unsustainable from an economic and environmental point of view. This study has shown how the implementation of the DMAIC cycle (Define, Measure, Analyze, Improve, Control) in an automotive component industry can lead to a very significant reduction in material waste and, consequently, a reduction in the number of workers on certain assembly lines. Improvement actions were defined and implemented once the factors capable of eliminating and/or reducing cable trimming on the assembly lines had been identified. With the actions implemented, about the case study used for validation, an annual gain of approximately €89,289 has been achieved and a gain of €288,343 will be achieved by approximately 2026, after the elimination of trimming on five assembly lines and the reduction of trimming on eight assembly lines.-
Descrição: dc.descriptionCIDEM ISEP School of Engineering Polytechnic of Porto, Rua Dr. António Bernardino de Almeida 431-
Descrição: dc.descriptionAssociate Laboratory for Energy Transports and Aerospace (LAETA-INEGI), Rua Dr. Roberto Frias 400-
Descrição: dc.descriptionSão Paulo State University School of Engineering and Sciences, Dr Ariberto Pereira da Cunha Portal das Colinas Avenue, 333, Guaratinguetá-
Descrição: dc.descriptionCollege of Technology São José Dos Campos Professor Jessen Vidal Centro Paula Souza Avenida Cesare Mansueto Giulio Lattes, 1350 Distrito Eugênio de Melo, SP-
Descrição: dc.descriptionSão Paulo State University School of Engineering and Sciences, Dr Ariberto Pereira da Cunha Portal das Colinas Avenue, 333, Guaratinguetá-
Idioma: dc.languageen-
Relação: dc.relationInternational Journal of Advanced Manufacturing Technology-
???dc.source???: dc.sourceScopus-
Palavras-chave: dc.subjectAutomotive sector-
Palavras-chave: dc.subjectBowden cable-
Palavras-chave: dc.subjectDMAIC-
Palavras-chave: dc.subjectLean-
Palavras-chave: dc.subjectSix Sigma-
Título: dc.titleMitigation strategies for waste elimination and cost reduction in the manufacture of Bowden cables-
Tipo de arquivo: dc.typelivro digital-
Aparece nas coleções:Repositório Institucional - Unesp

Não existem arquivos associados a este item.