Increasing RES Hosting Capacity in Distribution Networks Through Closed-Loop Reconfiguration and Volt/VAr Control

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorUniversidade Estadual Paulista (UNESP)-
Autor(es): dc.contributorModeling and Applied Social Sciences Center-
Autor(es): dc.contributorThe University of Porto and INESC TEC-
Autor(es): dc.creatorHome-Ortiz, Juan M.-
Autor(es): dc.creatorMacedo, Leonardo H.-
Autor(es): dc.creatorVargas, Renzo-
Autor(es): dc.creatorRomero, Ruben-
Autor(es): dc.creatorMantovani, Jose Roberto Sanches-
Autor(es): dc.creatorCatalao, Joao P. S.-
Data de aceite: dc.date.accessioned2025-08-21T17:08:03Z-
Data de disponibilização: dc.date.available2025-08-21T17:08:03Z-
Data de envio: dc.date.issued2023-03-02-
Data de envio: dc.date.issued2023-03-02-
Data de envio: dc.date.issued2021-12-31-
Fonte completa do material: dc.identifierhttp://dx.doi.org/10.1109/TIA.2022.3177175-
Fonte completa do material: dc.identifierhttp://hdl.handle.net/11449/241884-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/11449/241884-
Descrição: dc.descriptionThis article presents a novel mixed-integer second-order cone programming model to increase the photovoltaic (PV) hosting capacity and optimize the operation of distribution networks. The problem considers voltage and reactive (Volt/VAr) control through the optimal operation of capacitors banks, substations' on-load tap changers, voltage regulators, and network reconfiguration with radial and closed-loop operation topologies. The proposed formulation considers voltage-dependent models for loads and capacitor banks. The objective function maximizes the PV hosting capacity of the network. Numerical experiments are carried out using the 33-node and the 85-node networks. Results demonstrate the effectiveness of the proposed formulation to increase the penetration of PV sources, especially when the closed-loop operation is allowed, together with network reconfiguration and Volt/VAr control.-
Descrição: dc.descriptionSão Paulo State University Department of Electrical Engineering-
Descrição: dc.descriptionFederal University of ABC Engineering Modeling and Applied Social Sciences Center-
Descrição: dc.descriptionFaculty of Engineering The University of Porto and INESC TEC-
Descrição: dc.descriptionSão Paulo State University Department of Electrical Engineering-
Formato: dc.format4424-4435-
Idioma: dc.languageen-
Relação: dc.relationIEEE Transactions on Industry Applications-
???dc.source???: dc.sourceScopus-
Palavras-chave: dc.subjectClosed-loop topology-
Palavras-chave: dc.subjectDistribution networks reconfiguration-
Palavras-chave: dc.subjectMixed-integer second-order cone programming (MISOCP)-
Palavras-chave: dc.subjectPhotovoltaic (PV) hosting capacity-
Palavras-chave: dc.subjectVoltage and reactive (Volt/VAr) control-
Título: dc.titleIncreasing RES Hosting Capacity in Distribution Networks Through Closed-Loop Reconfiguration and Volt/VAr Control-
Tipo de arquivo: dc.typelivro digital-
Aparece nas coleções:Repositório Institucional - Unesp

Não existem arquivos associados a este item.