One-dimensional multi-period cutting stock problem with two stages applied to lattice slab production

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorUniversidade Estadual Paulista (UNESP)-
Autor(es): dc.contributorUniversidade Federal de São Carlos (UFSCar)-
Autor(es): dc.creatorBernardi, Fabricio-
Autor(es): dc.creatorPossa, Marina Gabriela-
Autor(es): dc.creatorRossi, Camila Elizandra-
Autor(es): dc.creatorBenevenuto, Luíz Guilherme Dercore-
Autor(es): dc.creatorNascif Junior, Iucif Abrão-
Autor(es): dc.creatorJesus, Jacqueline de-
Autor(es): dc.creatorOliveira, Barbara Cardoso de-
Autor(es): dc.creatorZanelatto, Carla-
Autor(es): dc.creatorSena, Joice Gama-
Autor(es): dc.creatorFonseca-Alves, Carlos Eduardo-
Autor(es): dc.creatorElias, Fabiana-
Data de aceite: dc.date.accessioned2025-08-21T21:28:32Z-
Data de disponibilização: dc.date.available2025-08-21T21:28:32Z-
Data de envio: dc.date.issued2023-03-01-
Data de envio: dc.date.issued2023-03-01-
Data de envio: dc.date.issued2021-12-31-
Fonte completa do material: dc.identifierhttp://dx.doi.org/10.1080/01605682.2022.2085067-
Fonte completa do material: dc.identifierhttp://hdl.handle.net/11449/240236-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/11449/240236-
Descrição: dc.descriptionThis study looks at a real-world production planning problem that arises in a Brazilian lattice slab factory. Based on its production, which comprises a process in two stages, the main concerns of the factory are the waste of steel trusses in the first stage, setups and inventory costs in the second stage. The proposed mathematical model is based on the one-dimensional multi-period cutting stock problem with two stages and aims at the minimization of setup, production and inventory costs, subject to capacity and demand balance constraints. To solve this model, different strategies based on the column generation procedure are implemented, where two sets of subproblems are used to provide cutting patterns for each stage. Then, different rounding strategies and the relax-and-fix heuristics are applied to identify integer solutions. We based the data set on real information from a specific factory and also from specialized websites. Computational results are used to evaluate the application of the proposed model in a realistic context.-
Descrição: dc.descriptionUniversidade Estadual Paulista (Unesp), São Paulo-
Descrição: dc.descriptionUniversidade Federal de São Carlos (UFSCar), São Paulo-
Descrição: dc.descriptionUniversidade Estadual Paulista (Unesp), São Paulo-
Idioma: dc.languageen-
Relação: dc.relationJournal of the Operational Research Society-
???dc.source???: dc.sourceScopus-
Palavras-chave: dc.subjectcolumn generation-
Palavras-chave: dc.subjectlattice joist production-
Palavras-chave: dc.subjectmathematical modeling-
Palavras-chave: dc.subjectProduction planning-
Palavras-chave: dc.subjectrelax-and-fix-
Título: dc.titleOne-dimensional multi-period cutting stock problem with two stages applied to lattice slab production-
Tipo de arquivo: dc.typelivro digital-
Aparece nas coleções:Repositório Institucional - Unesp

Não existem arquivos associados a este item.