Analysis of production resources improvement strategies in make-to-stock environments managed by the simplified drum-buffer-rope system

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorUniversidade Estadual Paulista (UNESP)-
Autor(es): dc.contributorUniversidade Federal de São Carlos (UFSCar)-
Autor(es): dc.contributorFundação Getúlio Vargas-
Autor(es): dc.creatorGovoni, Humberto-
Autor(es): dc.creatorde Souza, Fernando Bernardi-
Autor(es): dc.creatorCastro, Robson Flávio-
Autor(es): dc.creatorde Souza Rodrigues, José-
Autor(es): dc.creatorPires, Silvio Roberto Ignacio-
Data de aceite: dc.date.accessioned2025-08-21T21:16:25Z-
Data de disponibilização: dc.date.available2025-08-21T21:16:25Z-
Data de envio: dc.date.issued2022-04-28-
Data de envio: dc.date.issued2022-04-28-
Data de envio: dc.date.issued2020-12-31-
Fonte completa do material: dc.identifierhttp://dx.doi.org/10.1590/1806-9649-2021v28e55-
Fonte completa do material: dc.identifierhttp://hdl.handle.net/11449/222903-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/11449/222903-
Descrição: dc.descriptionTheory of Constraints (TOC) states that every system has a single constraint that limits its performance, on which improvement efforts should be concentrated. This paper compared, through computer simulation, several methods of identifying the capacity-constrained resource in the perspective of a process of continuous improvement. Six make-to-stock (MTS) production line configurations managed by the Simplified Drum-Buffer-Rope (S-DBR) system were simulated, in which six improvement methods were applied, three of them based on the TOC literature, and their performance measured and compared in terms of cycle time and order fill rate. The results showed that, in balanced systems, improvements spread over all resources allowed better results, because, in this case, it is necessary to improve everything to benefit the overall performance. In unbalanced environments, on the other hand, the three methods recommended by TOC, which recommend efforts concentrated on the weakest point of the system, achieved superior performance, with emphasis on the strategy based on the level of utilization. In addition to advancing the frontiers of knowledge in continuous improvement and TOC, the research results show that managers should focus their attention on the resource with the highest degree of utilization to get better and faster performance gains.-
Descrição: dc.descriptionUniversidade Estadual Paulista Departamento de Engenharia de Produção, SP-
Descrição: dc.descriptionUniversidade Federal de São Carlos Departamento de Engenharia de Produção, SP-
Descrição: dc.descriptionFundação Getúlio Vargas Departamento de Administração, RJ-
Descrição: dc.descriptionUniversidade Estadual Paulista Departamento de Engenharia de Produção, SP-
Idioma: dc.languageen-
Relação: dc.relationGestao e Producao-
???dc.source???: dc.sourceScopus-
Palavras-chave: dc.subjectContinuous improvement-
Palavras-chave: dc.subjectMake-to-availability-
Palavras-chave: dc.subjectSimplified drum buffer rope-
Palavras-chave: dc.subjectSimulation-
Palavras-chave: dc.subjectTheory of constraints-
Título: dc.titleAnalysis of production resources improvement strategies in make-to-stock environments managed by the simplified drum-buffer-rope system-
Título: dc.titleAnálise de estratégias de melhoria de recursos produtivos em ambientes make-to-stock gerenciados pelo sistema tambor-pulmãocorda simplificado-
Tipo de arquivo: dc.typelivro digital-
Aparece nas coleções:Repositório Institucional - Unesp

Não existem arquivos associados a este item.