Joint Reconfiguration of Feeders and Allocation of Capacitor Banks in Distribution Systems Using a Multi-Start Strategy

Registro completo de metadados
MetadadosDescriçãoIdioma
Autor(es): dc.contributorUniversidade Estadual Paulista (UNESP)-
Autor(es): dc.creatorMontsutsumi, Marcio M.-
Autor(es): dc.creatorMelchor, Jose N.-
Autor(es): dc.creatorMaccdo, Leonardo H.-
Autor(es): dc.creatorRomero, Ruben-
Autor(es): dc.creatorIEEE-
Data de aceite: dc.date.accessioned2021-03-11T01:14:17Z-
Data de disponibilização: dc.date.available2021-03-11T01:14:17Z-
Data de envio: dc.date.issued2019-10-04-
Data de envio: dc.date.issued2019-10-04-
Data de envio: dc.date.issued2017-01-01-
Fonte completa do material: dc.identifierhttp://hdl.handle.net/11449/185111-
Fonte: dc.identifier.urihttp://educapes.capes.gov.br/handle/11449/185111-
Descrição: dc.descriptionConselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)-
Descrição: dc.descriptionCoordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)-
Descrição: dc.descriptionFundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)-
Descrição: dc.descriptionProcesso FAPESP: 2015/21972-6-
Descrição: dc.descriptionProcesso FAPESP: 2015/04190-4-
Descrição: dc.descriptionProcesso FAPESP: 2016/10992-9-
Descrição: dc.descriptionThis paper presents a multi-start optimization algorithm that performs the simultaneous reconfiguration of feeders and allocation of capacitor banks in radial distribution systems. The objective is to find an optimal operating topology for the system together with an optimal plan of investment and operation for capacitor banks that minimizes the operating and investment costs over a chosen horizon. Thus, the cost of energy losses and the investment cost of purchasing and installing capacitor banks should be minimized. In this way, the reconfigured system with the fixed and switchable capacitor banks allocated allows the system to operate efficiently. The effectiveness of the proposed method is demonstrated using the 84-node system, well-known in the specialized literature.-
Formato: dc.format6-
Idioma: dc.languageen-
Publicador: dc.publisherIeee-
Relação: dc.relation2017 Ieee Pes Innovative Smart Grid Technologies Conference - Latin America (isgt Latin America)-
Direitos: dc.rightsopenAccess-
Palavras-chave: dc.subjectCapacitor banks allocation-
Palavras-chave: dc.subjectdistribution systems reconfiguration-
Palavras-chave: dc.subjectloss reduction-
Palavras-chave: dc.subjectmulti-start metaheuristic-
Palavras-chave: dc.subjectPrim's algorithm-
Título: dc.titleJoint Reconfiguration of Feeders and Allocation of Capacitor Banks in Distribution Systems Using a Multi-Start Strategy-
Aparece nas coleções:Repositório Institucional - Unesp

Não existem arquivos associados a este item.