Atenção: Todas as denúncias são sigilosas e sua identidade será preservada.
Os campos nome e e-mail são de preenchimento opcional
Metadados | Descrição | Idioma |
---|---|---|
Autor(es): dc.creator | Tavares, Luís Valadares | - |
Autor(es): dc.creator | Ferreira, J. Antunes | - |
Autor(es): dc.creator | Coelho, José | - |
Data de aceite: dc.date.accessioned | 2019-08-21T16:55:56Z | - |
Data de disponibilização: dc.date.available | 2019-08-21T16:55:56Z | - |
Data de envio: dc.date.issued | 2011-05-06 | - |
Data de envio: dc.date.issued | 2011-05-06 | - |
Data de envio: dc.date.issued | 1999 | - |
Fonte completa do material: dc.identifier | http://hdl.handle.net/10400.2/1785 | - |
Fonte: dc.identifier.uri | http://educapes.capes.gov.br/handle/10400.2/1785 | - |
Descrição: dc.description | The risk of the duration of a project exceeding a certain limit has been studied since the early papers proposing the PERT method but no results are available relating the statistical distribution of the total duration with the morphological features of the network. In this paper, a set of indicators is proposed to describe the morphology of the project network and an experimental research is carried out to relate the distribution of the total duration with such indicators. A random generator of project networks is used as well as a model to produce graphical representations of the network. Major results are presented showing how sensitive are the parameters of the distribution of the total duration to the morphology of the network, allowing the project manager to estimate the risk of delay in terms of the proposed indicators. Thus, these results can be used as a decision aid to select alternative designs for the project network taking into account the correspondent risk of delay. | - |
Idioma: dc.language | en | - |
Publicador: dc.publisher | ELSEVIER | - |
Relação: dc.relation | http://dx.doi.org/10.1016/S0377-2217(99)00150-2 | - |
Direitos: dc.rights | restrictedAccess | - |
Palavras-chave: dc.subject | Project network | - |
Palavras-chave: dc.subject | Morphology | - |
Palavras-chave: dc.subject | Delay | - |
Palavras-chave: dc.subject | Risk | - |
Título: dc.title | The risk of delay of a project in terms of the morphology of its network | - |
Tipo de arquivo: dc.type | livro digital | - |
Aparece nas coleções: | Repositório Aberto - Universidade Aberta (Portugal) |
O Portal eduCAPES é oferecido ao usuário, condicionado à aceitação dos termos, condições e avisos contidos aqui e sem modificações. A CAPES poderá modificar o conteúdo ou formato deste site ou acabar com a sua operação ou suas ferramentas a seu critério único e sem aviso prévio. Ao acessar este portal, você, usuário pessoa física ou jurídica, se declara compreender e aceitar as condições aqui estabelecidas, da seguinte forma: